Docs
OverviewPlatformPlatform APIA2P Messaging API
AI & MCP
Open dashboard
OverviewPlatformPlatform APIA2P Messaging API
AI & MCP
  • Overview
  • Introduction
  • Create an account
  • Choose your API
  • Authentication
  • AI & MCP
Product API
  • Guide
  • Quickstart
    • API tokens
    • Connected apps (OAuth)
    • Project readiness
    • Channel readiness
    • Senders
    • Attention
    • Recommendations
    • Overview
    • Contacts and attributes
    • Events
    • Query filter
    • Event query filter
    • Probes
    • Counting and retrieval
    • Segments
    • Overview
    • Creating a draft
    • Audience targeting
    • Message content
    • Dates and scheduling
    • Reading campaigns
    • Estimating and deleting
    • OverviewBeta
    • Templates
    • Creating and editing drafts
    • Triggers and exits
    • Nodes
    • Delays and waits
    • Overview
    • Statistics catalog
    • Building queries
    • Conversions & revenue
    • Reading results
    • Flow reports
    • Rate limits
    • Errors
  • Full API Reference
Ingest API
  • Guide
  • Quickstart
  • Authentication
  • Rate limits
  • Errors
  • Best practices
  • Full API Reference
Further reading
  • Query Filter
DashboardSupportinstasent.com

Platform API · Product API · Campaigns

Dates and scheduling

The date on a campaign draft is a calendar anchor, not a send time — nothing is scheduled from the API. This page covers the three accepted date forms, which timezone each one is read in, the separate time field, and why unparseable input is refused rather than guessed at.

On this page▾
  • The three accepted forms
  • Integrations should send the offset form
  • Sending the time separately
  • Parsing is strict on purpose
  • The one-year horizon
  • Scheduling the actual send
  • What's next

date places a campaign draft on the dashboard calendar so a marketer opening the project can see what is coming and when it was meant to go out. It is a planning anchor, and setting it arms nothing.

Nothing is scheduled by this endpoint, at any precision. A date to the minute, with a timezone offset, still produces a draft that will not send. Arming a campaign happens in the dashboard, at the review step, after a human has seen the estimate. There is no API field that skips it.

That estimate can now be started from the API, which changes nothing here: knowing what a campaign would cost is not a step towards sending it, and the confirmation at the review step is still a person's.

date is also entirely optional: omit it and the draft simply carries no date, which is the right choice when your integration knows what to say but not yet when.

The three accepted forms

The precision you send is the precision that is stored — and the input decides which timezone applies:

FormExampleInterpreted in
ISO 8601 with an offset2026-06-15T09:30:00+02:00, 2026-06-15T09:30:00Z, 2026-06-15T09:30+0200the offset you sent — the project's timezone is not consulted
Date and time, no offset2026-06-15T09:30, 2026-06-15 09:30the project's timezone
Day only2026-06-15the project's timezone, at 19:00

The project's timezone falls back to the organization's when the project does not set one of its own.

Integrations should send the offset form

{
  "date": "2026-06-15T09:30:00+02:00"
}

It is the only form that means the same instant on both ends. A server in another region, a container running in UTC, a laptop on summer time — none of them change what that string denotes. The two offset-less forms are a convenience for a human typing a date into your UI, where "half past nine" naturally means half past nine where the audience lives; they are the wrong choice for a machine that already knows the exact moment.

Sending the time separately

Some callers hold the day and the time apart — a date picker and a time picker, two columns in a spreadsheet — and joining them into an ISO string is busywork. time exists for exactly that:

{
  "date": "2026-06-15",
  "time": "09:30"
}

time is HH:MM, read in the project's timezone, and it replaces the 19:00 default a bare day would otherwise get.

Sending time alongside a date that already carries an hour is an error, not a precedence rule. {"date": "2026-06-15T09:30", "time": "11:00"} is refused with invalid-date. Two answers to the same question is how an integration ends up anchored at the wrong hour and never finds out why — so the API asks you to pick one instead of quietly choosing for you.

Parsing is strict on purpose

The accepted forms above are an allow-list. Anything else is refused with invalid-date rather than interpreted:

InputWhy it is refused
15/06/2026Ambiguous. Depending on the separator and locale it reads as day 15 or month 15 — an API that silently picks one is worse than one that says no.
tomorrow, +1 weekRelative expressions are not dates. Resolve them on your side, where you know the user's timezone.
2026-13-45Out of range. It is not rolled over into February of the following year.
2026-06-15T25:99Out of range. It is not rolled over into the next day.

The overflow cases are the ones worth designing around: a caller that computed a date wrongly gets told, at the moment of the call, instead of finding a campaign anchored on a day nobody chose.

The one-year horizon

A campaign date must be less than a year from now. A date beyond that is understood perfectly well and then refused by the campaign itself, so it comes back as a field-level 422 keyed by the campaign's own field name (campaignAt) rather than as an invalid-date code:

{
  "errors": {
    "fields": {
      "campaignAt": ["This value should be less than Jun 15, 2027, 12:00 AM."]
    }
  }
}

Scheduling the actual send

The send time is chosen in the dashboard, on the campaign's Review & schedule step, along with the delivery settings that surround it. The reader-facing walkthrough is Creating a campaign; Delivery settings covers the options that shape how the send runs once it is armed.

For an integration this means the handover is clean: you supply the intent — who, what, and the day it is meant for — and a person supplies the confirmation.

What's next

Creating a draft

The endpoint contract, the full request body, limits and error codes.

Audience targeting

Segments, inline filters and counting the reach up front.

Message content

Copy, senders, RCS buttons, SMS fallback and languages.

Last updated September 30, 2026

PreviousMessage contentNextReading campaigns
  • The three accepted forms
  • Integrations should send the offset form
  • Sending the time separately
  • Parsing is strict on purpose
  • The one-year horizon
  • Scheduling the actual send
  • What's next

© 2026 Instasent

Privacy PolicyTerms & ConditionsCookie PolicyLegal Notice
All systems operational